Blanchard Building / 21-09 Borden Ave, LIC

  • Vertical Self-Contained Air-Cooled Units
  • Fuel Oil System
  • All control work was done in house by our engineering team
  • Install off linears through lobby bars and public space
  • Exhaust Fans, Stair Pressurisation System
  • Drafting, Installation & Fabrication of Sheetmetal
  • Drafting, Installation of all Hydronic & Refrigeration Piping
  • Testing, Adjusting, Start up and Commissioning