Aliz Hotel / 310 West 40th Street, NYC

  • Vertical Stacked Air Cooler Units; Fresh Air Unit
  • Boiler Room Plant (3 Condensing Boilers, HX, Pumps)
  • Fuel Oil & Refrigeration Piping
  • All control work was done in house by our engineering team
  • Complete VRF system: Piping, Install, Commissioning
  • Exhaust Fans, Stair Preservation System
  • PTAC units in each hotel room
  • Fuel Oil Transfer System
  • Kitchen Exhaust System
  • Drafting, Installation & Fabrication of Sheetmetal
  • Drafting, Installation of all Hydronic & Refrigeration Piping
  • Testing, Adjusting, Start up and Commissioning