541 West 21st Street, NYC

  • Vertical Water-Cooled Units with economizer coils
  • (assembly in field)
  • Installation and Connection of Cooling Towers, OAU, ERV
  • FTR’s, cabinet unit heaters
  • Boiler room Plant (Condensing Boilers, Pumps)
  • Drafting, Installation & Fabrication of Sheetmetal
  • Drafting, Installation of all Hydronic & Refrigeration Piping
  • Testing, Adjusting, Start up and Commissioning