232 7TH Ave, NYC (HIGH-END TEMPORARY RESIDENTS, GROUND UP)

  • 100% outside air unit
  • VRF system
  • Stair pressurization system
  • Fuel oil system
  • Drafting, Installation & Fabrication of Sheetmetal
  • Drafting, Installation of all Hydronic & Refrigeration Piping
  • Testing, Adjusting, Start up and Commissioning