107 Columbia Heights, NYC (GUT RENOVATION)

  • Complete gut renovation and conversion of building to rental
  • Chiller plant
  • Boiler plant
  • Installation Hot Water/ Chill Water, Fan Coil Unit (120)
  • 2 condensing Boilers
  • Entire Piping & Ductwork distribution
  • Drafting, Installation & Fabrication of Sheetmetal
  • Drafting, Installation of all Hydronic & Refrigeration Piping
  • Testing, Adjusting, Start up and Commissioning